Drafting the V3 Pivot: We are shifting from rigid lead-sourcing to verified meetings booked. This is the "Revenue Architect" endgame.
Phase 1: SCU Lecture Prep. Secure V3 Beta Access. Run 10 benchmark sprints using standard SOPs to verify outcome quality and latency before scaling.
Phase 2: Live Strike. Once throughput is verified during the lecture, unlock the sandbox credit pool for the SCU Interns.
Master Strategy & HUD
Ollama Privacy Vetting
Market Agent Labor
Action Item: Respond to Founders for Beta Access. Defer credit ask until V3 performance is verified during SCU prep.